CUSTOMER HIGHLIGHT
For Holmes Plumbing, that straightforward delivery and placement was a big part of the benefit. The manifold was not delivered as a pile of parts that still needed extensive assembly. It arrived as a completed unit, already built out and ready for the next stage. Just as importantly, it was built with compliance in mind from the start. Because the system had already been prepared properly off site, the Holmes team did not have to worry about spending extra time working through that detail during installation or risking costly rework later. DELIVERED HERE SAVES TIME AND STOPS ANY REWORKS.” “ That is what Drillcut’s workshop is built for. Custom fabricated solutions engineered in advance, manufactured accurately, assembled before delivery, and supplied site ready to link in with the rest of the job. HAVING IT ALL COMPLIANT AND GETTING
For customers like Holmes Plumbing, it means less site labour tied up in repetitive assembly, less room for delays, and more confidence that what arrives is ready to go. And as Lachie’s feedback shows, when those systems are planned properly and delivered the right way, the time savings are not theoretical. They are felt immediately on site.
SCAN TO WATCH THE FULL HOLMES PLUMBING TESTIMONIAL
09
Powered by FlippingBook